August 1996 - Ground Floor
Diary Years  
       
       
       

 

One of the major jobs completed in August 1996 was the tiling of the lounge.

This room has a huge floor area (42m˛) which required the laying of more than 470 tiles and it took a big effort from the whole team to get all the tiles layed and grouted.

Tiles and adhesive ready for the lounge floor The picture on the left shows some of the boxes of tiles and sacks of adhesive powder that were to be used and on the right is tiling in progress. Lounge floor tiling in progress

The result, however, was worth it and we now have a good looking, hardwearing and easy to clean floor. Ideal for a holiday home.

  The tiled loung floor   The tiled loung floor  

 

Maggie tiling the shower The shower room and toilet became our first finished rooms (well, they are the smallest!).
We completed tiling the shower cubicle, tiled the floors and painted both rooms.
The shower room

 

On the other hand, all that changed in the kitchen was the addition of a bottled gas cooker but this was a big improvement over the camping stove. A new gas cooker

 