One of the major jobs completed in August 1996 was the tiling of the lounge.
This room has a huge floor area (42m˛) which required the laying of more than 470 tiles and it took a big effort from the whole team to get all the tiles layed and grouted.
![]() |
The picture on the left shows some of the boxes of tiles and sacks of adhesive powder that were to be used and on the right is tiling in progress. | ![]() |
The result, however, was worth it and we now have a good looking, hardwearing and easy to clean floor. Ideal for a holiday home.
![]() |
![]() |
![]() |
The
shower room and toilet became our first finished rooms
(well, they are the smallest!). We completed tiling the shower cubicle, tiled the floors and painted both rooms. |
![]() |
| On the other hand, all that changed in the kitchen was the addition of a bottled gas cooker but this was a big improvement over the camping stove. | ![]() |